Core units MSMENV272 Participate in environmentally sustainable work practices MSMSUP102 Communicate in the workplace MSMSUP106 Work in a team MSFFM2013 Use furniture making sector hand and power tools MSFFM3030 Produce manual and computer-aided production drawings MSFGN2001 Make measurements and calculations MSFGN3005 Read and interpret work documents MSFFM3031 Prepare cutting lists from design and production documentation Elective units MSFFM2016 Join solid timber MSFFM3041 Determine and document requirements for cabinetry installation MSFFM2017 Hand make timber joints MSFFM2018 Operate basic static machines safely MSFFM3042 Fabricate cabinetry MSFFF2012 Prepare surfaces for finishing MSFFM3026 Produce angled and curved components using manufactured board MSFFM3028
machinery and equipment AHCWRK409 Supervise work routines and staff performance BSBPMG428 Apply project life cycle management processes * We can develop additional elective units that are not listed on request (Please contact us for further information)
codes and specifications UEECO0012 Participate in voice and data communications work and competency development activities UEEDV0004 Install and connect data and voice communication equipment UEEDV0005 Install and maintain cabling for multiple access to telecommunication services UEEDV0006 Install and modify optical fibre performance data communication cabling UEEDV0008 Install
select and specify trees AHCARB509 Develop an arboricultural impact assessment report AHCARB510 Specify and audit tree work AHCARB511 Prepare arborist reports AHCARB513 Examine and assess trees AHCARB514 Diagnose tree diseases AHCWRK517 Interpret legislation Electives AHCBUS515 Prepare estimates
calculate quantities and mark out materials CPCPCM2041 Work effectively in the plumbing services sector CPCPCM2043 Carry out WHS requirements CPCPCM2045 Handle and store plumbing materials CPCPCM2046 Use plumbing hand and power tools CPCPCM2047 Carry out levelling CPCPCM2048 Cut and join sheet metal CPCPCM2054 Carry out simple concreting and rendering CPCPCM2055 Work safely on roofs CPCPCM3021 Flash penetrations through roofs and walls CPCPCM3022 Weld polymer pipes using fusion method CPCPCM3023 Fabricate and install non-ferrous pressure piping CPCPCM3024 Prepare simple drawings CPCPCM3025 Install trench support CPCPDR2021 Locate and clear blockages CPCPDR2025 Install stormwater and sub-soil drainage systems and drain work site CPCPDR2026 Install prefabricated inspection openings and inspection chambers CPCPDR3021 Plan layout and install below ground sanitary drainage systems CPCPDR3023 Install on-site domestic wastewater treatment plants and disposal systems CPCPFS3031 Fabricate and install fire hydrant and hose reel systems CPCPGS3048 Install gas pressure control equipment CPCPGS3049 Install gas appliance flues CPCPGS3051 Purge consumer piping CPCPGS3053 Disconnect and reconnect Type A gas appliances CPCPGS3054 Calculate and install natural ventilation for Type A gas appliances CPCPGS3056 Size and install consumer gas piping systems CPCPGS3059 Install LPG storage of aggregate storage capacity up to 500 litres CPCPGS3061 Install and commission Type A gas appliances CPCPSN3011 Plan the layout of a residential sanitary plumbing system and fabricate and install sanitary stacks CPCPSN3022 Install discharge pipes CPCPWT3020 Connect and install storage tanks to a domestic water supply CPCPWT3021 Set out and install water services CPCPWT3022 Install and commission water heating systems and adjust controls and devices CPCPWT3025 Install water pumpsets CPCPWT3026 Install and fit off sanitary fixtures
Assessment Kit-AURTTA127 Carry out basic vehicle servicing operations Graduate Diploma Core units MSMENV272 Participate inOur assessment resources contain everything you need to begin assessing your learners. Our assessment resources include: Assessment Pack (Student) Trainer Assessment Pack (Marking Guide) Mapping for each unit of competency Assessment Record Tools Our assessment resources have been aligned to learner cohorts, industry needs and ACSF indicated levels. In order to achieve this, we have conducted: Industry consultation Robust validations Assessment of